Skip to main content
See every side of every news story
Published • loading... • Updated

CNSAS Documents - Ceausescu's Train, Full of Defects: in the Cabins Rained, the Dirt Flowed in Bidets, and a Leak of Oil Was Erased in Hiding with a Cloth on the Wire

Summary by News.ro
The special train built for Nicolae Ceausescu was affected years in a row by a series of faults, shows documents from the archive of Security published by the National Council for the Study of the Archives of Security (CNSAS). In the reports there are recorded rains that enter through the ceiling, doors that broke from the walk, the mattresses and a wagon sent in circulation over the refusal of the controllers. The workers even received the task…

12 Articles

Center

The special train built for Nicolae Ceausescu has been affected years in a row by a series of defects, showing documents from the archive of Security published by the National Council for the Study of the Archives of Security (CNSAS).

·Bucharest, Romania
Read Full Article
Lean Left

The National Council for the Study of the Archives of Security (CNSAS) published on Mondays data from a file on the precarious technical condition and several existing faults on the special train used by the former communist dictator, Nicolae Ceauşescu.

Right

The train specially built for Nicolae Ceaușescu was supposed to be one of the symbols of luxury and performance of Romanian industry during the communist era. In reality, the train set intended for the dictator was full of malfunctions, water leaks, noisy installations and technical problems that could endanger the safety of passengers. Documents from the Securitate archives, presented on Monday, November 23, by the National Council for the Stud…

Lean Left

The special train built for Nicolae Ceausescu was affected years in a row by a series of faults, shows documents from the archive of Security published by the National Council for the Study of the Archives of Security (CNSAS). In the reports there are recorded rains that enter through the ceiling, doors that broke from the walk, the mattresses and a wagon sent in circulation over the refusal of the controllers. The workers even received the task…

Documents from the archive of Security. Ceauşescu's luxury train, an epic of the saving work: "the place in wagons, and the workers were hiding the oil leaks with a rag on the wire. "The documents from the archive of Security show how the luxury train of Nicolae Ceauşescu, built in Arad and delivered nine years late, was [...]

Read Full Article

Equality, equality, but not for the greater communist regime. After using the royal train without any restraint, Ceauşescu dreamed of one more like it in 1968. It was supposed to be ready 1973, but it was in 1982. And security documents indicate numerous problems.

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources lean Left
50% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

historia.ro broke the news on Monday, November 23, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal