Skip to main content
See every side of every news story
Published • loading... • Updated

Cattenom. Incident on a High Voltage Line: a New Level 1 Event at the Nuclear Power Plant

In the space of 15 days, the Cattenom power plant reported two significant level 1 events to the Nuclear Safety and Radiation Protection Authority. The latest incident involved the use of the spare diesel engines in tranche 1, which is very rare. EDF also reported on the return to service of tranche 4 after a partial visit which led to the extensions.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

2 Articles

In the space of 15 days, the Cattenom power plant reported two significant level 1 events to the Nuclear Safety and Radiation Protection Authority. The latest incident involved the use of the spare diesel engines in tranche 1, which is very rare. EDF also reported on the return to service of tranche 4 after a partial visit which led to the extensions.

This failure also impacts Unit 3, which is shutting down for maintenance. Back-up diesel engines have been started.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

virgule.lu broke the news on Tuesday, November 17, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal