Published • loading... • Updated
Camiguin Solar Project breaks ground as Philippines' first fully compliant EGF–LTO renewable energy facility
Summary by The Independent Investor
1 Articles
1 Articles
Camiguin Solar Project breaks ground as Philippines' first fully compliant EGF–LTO renewable energy facility
Camigreen Inc. has officially broken ground on the 4 MWp Camiguin Solar Power Project in Barangay Liong, Guinsiliban. The facility is significant as the first fully developed renewable energy project in the Philippines implemented under the Embedded Generation Facility–Lease-to-Own (EGF–LTO) framework. The project is designed to provide daytime embedded generation to the Camiguin Electric Cooperative (CAMELCO), a solution intended to reduce the …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
