PİRHA - Evaluating the "Bozcaada Yacht Wharf Construction" project, which was tendered at the end of 2025 in Bozcaada Port, coastal and port engineer Süheyla Doğan stated that the main breakwater urgently needs to be repaired, but that the tendered project must be technically re-evaluated. Doğan drew attention to the scale of the project, its possible effects on the marine ecosystem, and concerns about pollution within the port, stating that it …
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
PİRHA - Evaluating the "Bozcaada Yacht Wharf Construction" project, which was tendered at the end of 2025 in Bozcaada Port, coastal and port engineer Süheyla Doğan stated that the main breakwater urgently needs to be repaired, but that the tendered project must be technically re-evaluated. Doğan drew attention to the scale of the project, its possible effects on the marine ecosystem, and concerns about pollution within the port, stating that it …