Published • loading... • Updated
GE Vernova Hitachi’s SMR Design Speeds Through UK Regulatory Process
Summary by New Civil Engineer
2 Articles
2 Articles
GE Vernova Hitachi’s SMR design speeds through UK regulatory process
UK regulators have cleared the GE Vernova Hitachi BWRX‑300 small modular reactor (SMR) design to move forward in the Generic Design Assessment process in record time. The post GE Vernova Hitachi’s SMR design speeds through UK regulatory process appeared first on New Civil Engineer.
Blog Post: BWRX-300 Small Modular Reactor Passes Step 2 Of UK’s Generic Design Assessment
The GE Vernova Hitachi Nuclear Energy (GVH) BWRX-300 small modular reactor (SMR) has completed Step 2 of the generic design assessment (GDA) process in the UK. The BWRX-300 completed Step 1 of the GDA process in December 2024 and GVH has now received ...
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium