(The following text is taken in full from the press note sent to the Agency Opinion) //// SP3, MEETING AND PRESSPOINT ON THE STATE OF WORK At the Infrastructure and Mobility Directorate of the Basilicata Region, in Potenza, operational meeting on the ongoing works on the ridge that flanks the provincial road 3 Tyrrhenian, in the locality Colla, in the stretch between Maratea and [...]
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
(The following text is taken in full from the press note sent to the Agency Opinion) //// SP3, MEETING AND PRESSPOINT ON THE STATE OF WORK At the Infrastructure and Mobility Directorate of the Basilicata Region, in Potenza, operational meeting on the ongoing works on the ridge that flanks the provincial road 3 Tyrrhenian, in the locality Colla, in the stretch between Maratea and [...]