Bartica Stelling extension commissioned for $553m
4 Articles
4 Articles
$553M waterfront upgrade commissioned at Bartica Stelling
President Ali speaking at the commissioning ceremony President Dr Mohamed Irfaan Ali on Sunday morning commissioned the $553 million extended Bartica Stelling concrete facility, making Bartica, known as the “Gateway to the Interior,” better positioned to serve the growing demands of the Transport and Harbour sector in that region. The 23,000 square feet reinforced concrete Stelling will now provide additional space for vehicular and pedestrian i…
Bartica Stelling extension commissioned for $553m
Bartica is now better positioned to service the growing demands of the transport sector following the commissioning yesterday of the extended stelling facility. The article Bartica Stelling extension commissioned for $553m appeared first on Stabroek News.
President Ali commissions $553M Bartica Stelling - Guyana Chronicle
– Modern facility to boost economic activity, connectivity FOR years, the people of Bartica have relied on their riverside hub as a lifeline to the rest of Guyana, and now the gateway has been transformed. President Dr Irfaan Ali commissioned the new $553 million Bartica Stelling, a modern, safer and more efficient port facility that […]
$553M waterfront upgrade commissioned at Bartica Stelling - INews Guyana
Bartica, known as the “ Gateway to the Interior,” is now better positioned to service the growing demands of the Transport and Harbour sector following the commissioning of the extended Stelling facility. The $553 million 23,000 square feet reinforced concrete Stelling was commissioned by H.E. President Dr Mohamed Irfaan Ali this morning. It will now […] The post $553M waterfront upgrade commissioned at Bartica Stelling appeared first on INews G…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium