Skip to main content
See every side of every news story
Published • loading... • Updated

Baluchistan Wheels to install 1MW solar at Hub plant

Baluchistan Wheels Ltd has signed an agreement with Reon Energy Ltd for the supply and installation of a 1 megawatt-peak (MWp) solar photovoltaic system at its plant in Hub, Balochistan. The listed company disclosed the development in a notice to the Pakistan Stock Exchange (PSX) on Monday. “This is to inform that Baluchistan Wheels Limited has signed an agreement with Reon Energy Limited, 3rd Floor, Dawood Centre, MT Khan Road, Karachi, for the…

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Business Recorder broke the news on Monday, November 23, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal