Aztec Drills 70.1 Meters of 0.80 g/t AuEq (0.49 g/t Au and 16.85 g/t Ag) from Surface in TR26-54 at the Tombstone Project, Arizona CEO Dyakowski: "TR26-54 and TR26-60 were drilled as step-outs to the east and west of our previously reported holes, and both returned broad zones of oxide gold-silver mineralization." Aztec Minerals Corp. Tue, 11/10/2026
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.