Damaged Chernobyl Nuclear Site Needs Urgent Funding, Warns European Development Bank
19 Articles
19 Articles
In Chernobyl, according to the European Bank for Reconstruction and Development, environmental damage is imminent. There is no money to repair the damaged protective shell.
One and a half years after a heavy drone attack by the Russians, the protective shell of the Chernobyl nuclear reactor is increasingly losing its integrity. In order to prevent a creeping radioactive disaster, money is needed now. A lot of money. But who pays for Europe's nuclear security?
According to the European Bank for Restructuring and Development (EBRD), 500 million euros are needed for emergency repairs to the Chernobyl nuclear power plant. The Ukrainian nuclear plant, damaged by a Russian drone attack, could potentially cause a new environmental disaster, reports Politico.
The damaged containment structure over the destroyed fourth reactor of the Chernobyl nuclear power plant is in urgent need of repair, the European Bank for Reconstruction and Development (EBRD) has warned. The bank estimates that the massive steel structure, damaged by a Russian drone attack in February last year, will cost around €500 million to repair. Although there is no immediate threat at present, delaying the repair could lead to serious …
Coverage Details
Bias Distribution
- 43% of the sources lean Left, 43% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium















