Skip to main content
See the bias in every story
Published • loading... • Updated

Acro Bailey Bridge Constructed by Army After 45 Days of Betaravatima

Kathmandu. To ease the road traffic which was blocked due to severe floods in Bhotekoshi area of Rasuwako, Betravatima Acro Bailey Bridge located on the border of Nuwakot and Rasuwako has been constructed and brought into operation. The Nepali Army inaugurated the bridge, whose construction was completed 45 days after the flood on Bhadau 10th, during a program today. Acro bridge Galchi-Rasuwagadhi constructed at Senale Betravatima […]
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

2 Articles

Kathmandu. To ease the road traffic which was blocked due to severe floods in Bhotekoshi area of Rasuwako, Betravatima Acro Bailey Bridge located on the border of Nuwakot and Rasuwako has been constructed and brought into operation. The Nepali Army inaugurated the bridge, whose construction was completed 45 days after the flood on Bhadau 10th, during a program today. Acro bridge Galchi-Rasuwagadhi constructed at Senale Betravatima […]

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Nepal Press : Facts First, Truth Foremost – Online News Portal from Nepal in Nepali Language broke the news on Sunday, October 11, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal