Published 9 days ago • loading... • Updated 8 days ago
Part of A12 Near Ingatestone Shut Due to Road 'Breaking Up'
National Highways said delays reached 48 minutes as contractors assessed water damage and prepared repairs before the road can reopen.
On Monday, the A12 southbound closed between J14 for Margaretting and J13 for Ingatestone after the tarmac began "breaking up." Essex Police warned the road is "likely to be closed for some time."
National Highways confirmed "significant water damage," believed to be from wastewater, caused the failure. The agency expressed concern that damage may have compromised the structural integrity beneath the carriageway.
Motorists currently face travel delays of around 35 minutes, with some congestion reaching up to 48 minutes. National Highways advised drivers to exit at J15 Webb and follow the B1002 towards the area.
A Ground Penetrating Radar survey will take place to establish the extent of damage beneath the road surface. This assessment is essential to determine the scale of repairs needed before reopening.
With no confirmed timescale for reopening, Essex Police reiterated the road is "likely to be closed for some time" as significant repair work is anticipated to ensure structural safety.