The images of the video condense in just a few seconds a work of extreme precision. A huge concrete drawer, built next to the railway tracks in Plasencia, progresses slowly until disappearing under them and being fitted into its definitive location. It is the new lower step executed in the 6+165 kilometer point of the line L026 Plasencia-Bifurcación San Esteban, a performance linked to the works of the high speed Madrid-Extremadura.
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The images of the video condense in just a few seconds a work of extreme precision. A huge concrete drawer, built next to the railway tracks in Plasencia, progresses slowly until disappearing under them and being fitted into its definitive location. It is the new lower step executed in the 6+165 kilometer point of the line L026 Plasencia-Bifurcación San Esteban, a performance linked to the works of the high speed Madrid-Extremadura.