Rzeszów News
Work on the expanded section of the S19 expressway between Stobierna and Jasionka is entering its final phase. The contractor is milling the old surface and laying new asphalt. The General Directorate for National Roads and Motorways (GDDKiA) confirms: the full section, with two lanes in both directions (2x2), will be open to drivers by the end of September. Road crews are not slowing down on the 13-kilometer section of the S19 Soko…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Rzeszów News
Work on the expanded section of the S19 expressway between Stobierna and Jasionka is entering its final phase. The contractor is milling the old surface and laying new asphalt. The General Directorate for National Roads and Motorways (GDDKiA) confirms: the full section, with two lanes in both directions (2x2), will be open to drivers by the end of September. Road crews are not slowing down on the 13-kilometer section of the S19 Soko…