In Tamil Nadu, in southern India, the New Pamban Bridge was inaugurated on April 6, 2025, connecting Rameswaram to the mainland by rail. With approximately 2.08 km, the crossing has a 72.5 metre moving central span, which can climb vertically up to 17 metres to allow for the passage of ships.
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
In Tamil Nadu, in southern India, the New Pamban Bridge was inaugurated on April 6, 2025, connecting Rameswaram to the mainland by rail. With approximately 2.08 km, the crossing has a 72.5 metre moving central span, which can climb vertically up to 17 metres to allow for the passage of ships.