Why Overhead Glass Walls Get Specified Too Late in Restaurants
1 Articles
1 Articles
Why Overhead Glass Walls Get Specified Too Late in Restaurants
The framing is up on a 3,400 square foot restaurant shell in Brighton, the roof is dried in, and someone on the design side finally asks what is going into the two twelve-foot openings on the patio elevation. Glass overhead walls, apparently. That answer lands about four months late, and the argument of this piece is simple: an operable glass wall is a structural, long-lead package rather than a finish, so the contractors listed for garage door …
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium