US Group Plans to Build Austria's Largest Battery Storage Facility in Molln
6 Articles
6 Articles
Only in September the largest battery storage system was put into operation in the Innviertel in Wagenham – now a project of more than three times its size is planned in Molln (also OÖ). Energy expert Robert Tichler explains the boom.
In Upper Austria, a battery storage system with 300 megawatts of power is to be created, which is connected at the highest grid level.
The project is still in the early stages, but the location and size are confirmed. According to this, the internationally active British power generator Contour Global is expected to bring 300 megawatts of power and 1.2 gigawatt hours of capacity to the grid in 2029.
The international investor ContourGlobal wants to build a 300 megawatt battery park in Molln in the Upper Austrian district of Kirchdorf. This would make the project the largest battery storage facility in Austria. The site is supposed to be a property of the local developer Kurt Bernegger, who secured access to the grid for the top level 1 years ago, reported the "Upper Austrian News" (Saturday edition).
MOLLN. International investor ContourGlobal is planning a 300 megawatt battery park on the Bernegger site and is undermining current projects.
Coverage Details
Bias Distribution
- 100% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium










