Published 4 months ago • loading... • Updated 4 months ago
First of Three Stranded Narrow Boats Refloated After Shropshire Canal Breach
The Pacemaker was refloated from a 50-metre canal sinkhole after a pre-Christmas breach that stranded three boats, with two still awaiting recovery operations.
Summary by The Independent
10 Articles
10 Articles
+6 Reposted by 6 other sources
First of three stranded narrow boats refloated after Shropshire canal breach
The rear of the Pacemaker was left hanging over a huge ‘sinkhole’ after a canal bank collapsed in the early hours of December 22.
Canal breach near Whitchurch will cost 'several million' and take most of a year to repair
Repairing a breach on the Llangollen Canal near New Mills Lift Bridge, Whitchurch, will cost “several million pounds” and take the majority of the year, the Canal & River Trust has said. The post Canal breach near Whitchurch will cost ‘several million’ and take most of a year to repair appeared first on New Civil Engineer.
Coverage Details
Total News Sources10
Leaning Left3Leaning Right2Center3Last Updated38% Left, 37% Center
Bias Distribution
- 38% of the sources lean Left, 37% of the sources are Center
38% Left
L 38%
C 37%
R 25%
Factuality
To view factuality data please Upgrade to Premium







