Published • loading... • Updated
First of Three Stranded Narrow Boats Refloated After Shropshire Canal Breach
The Pacemaker was refloated from a 50-metre canal sinkhole after a pre-Christmas breach that stranded three boats, with two still awaiting recovery operations.
Summary by The Independent
10 Articles
10 Articles
Canal breach near Whitchurch will cost 'several million' and take most of a year to repair
Repairing a breach on the Llangollen Canal near New Mills Lift Bridge, Whitchurch, will cost “several million pounds” and take the majority of the year, the Canal & River Trust has said. The post Canal breach near Whitchurch will cost ‘several million’ and take most of a year to repair appeared first on New Civil Engineer.
Coverage Details
Total News Sources10
Leaning Left3Leaning Right2Center3Last UpdatedBias Distribution38% Left, 37% Center
Bias Distribution
- 38% of the sources lean Left, 37% of the sources are Center
38% Left
L 38%
C 37%
R 25%
Factuality
To view factuality data please Upgrade to Premium







