Skip to main content
See every side of every news story
Published • loading... • Updated

Rock Collapse at Tarbela T5 Sends Water Into Tunnel, Work Stopped

  • On Monday, a protective bund breach flooded the Tarbela Dam 5th Extension Hydropower Project in Haripur, forcing the Water and Power Development Authority to suspend construction work indefinitely.
  • The incident occurred during excavation of the 2nd Bench Connecting Tunnel when a weak rock mass collapsed, allowing water from the Intake Pit to breach the protective embankment.
  • Haripur Deputy Commissioner Waseem Ahmed confirmed all foreign and Pakistani workers were evacuated safely, while emergency teams rescued one local worker who was submerged in the tunnel.
  • WAPDA officials dismissed reports of tunnel collapse, confirming the main tunnel, power house, and switchyard remain undamaged; crews have drained the Intake Pit and begun dewatering operations.
  • A high-level inquiry will examine whether structural weakness or technical faults caused the bund failure. "The next course of action would be determined," Ahmed added, after investigation results arrive.
Insights by Ground AI

17 Articles

Lean Right

China often awards contracts for major Pakistani projects. However, China also outsources these projects to its own second-hand companies. This incident in Khyber Pakhtunkhwa is a result of this.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 71% of the sources lean Right
71% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

The Express Tribune broke the news in Karachi, Pakistan on Monday, November 9, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal