Skip to main content
See every side of every news story
Published • loading... • Updated

Nordex Enters Albania with 84 MW Wind Farm Order From VERBUND

Summary by citybuzz.co
Nordex Group will supply and install twelve N163/6.X turbines for Albania's first wind farm, the 84 MW Spille project, under a contract with VERBUND that includes a 15-year service agreement and marks a key step in diversifying Albania's hydropower-dominated electricity system. The post Nordex Enters Albania with 84 MW Wind Farm Order from VERBUND appeared first on citybuzz.

4 Articles

Die PresseDie Presse
Reposted by
KurierKurier
Lean Right

The Spille wind farm is built about 50 kilometres south of the port city of Durrës. The twelve planned wind turbines come from the German manufacturer Nordex. Start-up is planned for spring 2028.

·Vienna, Austria
Read Full Article

Verbund has placed an order with Nordex for the supply and construction of twelve N163/6.X wind turbines for the 84 MW Spille wind farm in Albania. The contract also includes a service contract with a duration of 15 years. The commissioning of the wind farm is planned for spring 2028. Dietmar Reiner, Managing Director of Verbund Green Power: "The Spille project, Albania's first wind farm, marks an important milestone for the country's energy tra…

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

boerse-social.com broke the news on Monday, November 9, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal