Skip to main content
See every side of every news story
Published • loading... • Updated

Two Construction Sites in Succession: Kissinger Straße & Würzburger Straße

The city of Bad Kissingen is building a new water supply for the terrace swimming pool (TSB). The previous supply via the Würzburger Straße was temporarily impaired by insufficient water pressure; moreover, the existing system no longer corresponds to the state of the art. The terrace swimming pool will therefore be supplied by Kissinger Straße in the future. To this end, the installation of a new sliding cross is required at the Ostringkreuzung.

1 Articles

Center

The city of Bad Kissingen is building a new water supply for the terrace swimming pool (TSB). The previous supply via the Würzburger Straße was temporarily impaired by insufficient water pressure; moreover, the existing system no longer corresponds to the state of the art. The terrace swimming pool will therefore be supplied by Kissinger Straße in the future. To this end, the installation of a new sliding cross is required at the Ostringkreuzung.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

osthessen-news.de broke the news on Thursday, October 29, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal