Key Moment on an Important Section of the Sibiu-Pitești Highways. Work at the Longest Tunnel in Romania
4 Articles
4 Articles
The platform for mounting and launching the TBM that will drill the Poiana Tunnel, on section 3 Cornetu – Tigveni of the Sibiu – Pitești motorway, is almost finished, announces Monday the Regional Directorate of Roads and Bridges (DRDP) Craiova. It will also soon arrive in the yard the first component of "the mole, respectively drilling head.
The authorities of the Directorate of Roads and Bridges (DRDP) Craiova transmits that the platform intended to mount and launch the TBM (tunnel boring machine / tunnel drilling machine) that will drill the Poiana Tunnel, on Section 3 Cornetu–Tigveni of the Sibiu–Pitești Highway, is almost completed.
The reverse number for the Poiana Tunnel. The giant tool that will pierce the mountain enters the assembly stage. One of the most spectacular moments of the works at the Sibiu–Pitești Highway is approaching. On Section 3 Cornetu-Tigveni, the Poiana Tunnel site enters a decisive stage: the preparations for the installation of the huge TBM, the machine that will drill through the mountain. According to the Regional Directorate of [...] Article FOT…
The platform for mounting and launching the TBM that will drill the Poiana Tunnel, on Section 3 Cornetu–Tigveni of the Sibiu–Pitești Highway, is almost finished. The builders announce that the first component of the machine will soon arrive in the yard.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium






