Skip to main content
See every side of every news story
Published • loading... • Updated

CNAIR Announced when Traffic Could Open on the Sublacu De Barcău - Chiribiş Section of the Transylvania Highway

Summary by antena3.ro
The opening of the circulation on the section Sulacu de Barcău - Chiribiş of the Transylvania Highway (A3), in the length of 26.35 km, is estimated for the end of this year, the Director General of...

8 Articles

Lean Left

The opening of the circulation on the section Sulacu de Barcău - Chiribiş of the Transylvania Highway (A3), in the length of 26.35 km, is estimated for the end of this year, the Director General of...

Cristian Pistol, director general of the National Road Infrastructure Management Company, announced on Saturday, November 21, in a Facebook post, that the opening of the circulation on the Sublacu de Barcău - Chiribiș section of the Transylvania Highway (A3) is estimated for the end of this year.

·Bucharest, Romania
Read Full Article

The works on the Lot Sulacu de Barcău – Chiribiș, part of the Transylvania Highway, is nearing the end, and the opening of the circulation will take place until the end of the year, the director general of the Cristian Pistol Road Company announced Saturday. The Romanian constructor Construction Erbaşu SA performs the last necessary works to complete this highway sector: mounting the parapets, [...]

The works on the Sullacu de Barcău – Chiribiș section, with a length of 26.35 kilometers, reached a physical stage of 98%, and the authorities estimate that the circulation could be opened by the end of 2026. The Romanian constructor Erbaşu SA is on the last hundred meters with...

Circulation on the Sublacu de Barcău – Chiribis of the Transylvania Highway (A3) section, with a length of 26.35 km, could be opened by the end of 2026

·Romania
Read Full Article

The opening of the circulation on the Sublacu de Barcău – Chiribiş section of the Transylvania Highway (A3), in length of 26.35 km, is estimated for the end of this year, announced Saturday the Director General of the National Road Infrastructure Management Company (CNAIR), Cristian Pistol. "Works on the Sublacu de Barcău – Chiribiş section of the Transylvania Highway (#A3), in length of [...] Article Circulation on the Sublacu de Barcău – Chiri…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Mediafax broke the news on Saturday, November 21, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal