The Metro Tunnel Boring Machine Reached Sitnyakovo
4 Articles
4 Articles
The tunnel boring machine used to build the Slatina metro extension has reached the Sitnyakovo metro station, which is located on the Slatina Boulevard and Geo Milev Street. This is an important stage in the construction of the underground section and means that the machine has already passed through most of the planned route, Metropolitan EAD announced. The Sitnyakovo Blvd. station is the last in the six-kilometer section that the machine must …
The Vitosha Tunnel Boring Machine, which is building the underground route of the Sofia Metro extension through Slatina, has reached the future Sitnyakovo Metro Station. This is […] The article The Vitosha Tunnel Boring Machine has reached the future Sitnyakovo Metro Station was first published on MySofia.
The tunnel boring machine for the metro extension through the Slatina district has reached the Sitnyakovo metro station, the Sofia Municipality announced. So far, 3.7 km of the total six-kilometer route have been dug, with about 900 meters remaining until the end of the tunnel. Sitnyakovo station, located on the boulevard of the same name and Geo Milev Street, is the last stop on the route, to which you need to […]
3.7 km of the tunnel for the metro through “Slatina” are built, 900 meters remain until the finish. This was announced today by the Metropolitan Municipality. The tunneling machine with which the extension of the metro through “Slatina” is being built has reached...
Coverage Details
Bias Distribution
- 100% of the sources lean Left
Factuality
To view factuality data please Upgrade to Premium







