️ — Syria has officially begun work on establishing a new border crossing linking Qamishli in Hasakah Governorate with Nusaybin in southeastern Turkey
5 Articles
5 Articles
Excavation and earthwork have begun on the Qamishlo side with construction machinery for the planned Nusaybin-Qamishlo border crossing.
The Syrian government has begun infrastructure work to reopen the Qamishli-Nusaybin border crossing, which closed in 2012. The planned crossing, covering approximately 558,000 square meters, aims to be the seventh border crossing point between Turkey and Syria, contributing to the development of trade and transit transportation.
The Syrian government announced that work has begun on the construction of the Qamishli-Nusaybin border crossing, which was closed in 2012 and is planned to be the seventh border crossing between Turkey and Syria. Mazin Alloush, Director of International Relations and Cooperation at the Syrian General Directorate of Border Crossings and Customs, told Anadolu Agency (AA) that excavation, leveling, and technical preparation work has begun at the Q…
The Syrian government announced the start of work on the construction of the Qamishli-Nusaybin Border Gate, which closed in 2012. Mazin Alush, Director of International Relations and Cooperation at the General Border Gates and Customs Administration of Syria, said: “We are officially starting the work of building and equipping this vital border gate that will connect Syria and Turkey. The gate will be the seventh border crossing point between th…
Coverage Details
Bias Distribution
- 100% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium





