Soil Caved in During the Construction of the Third Railway Line in Mirzapur: Trains on the Down Line Stopped Operating, Seven Routes Changed
7 Articles
7 Articles
During construction of a third railway line between Mirzapur and Jhingura in Uttar Pradesh, a mudslide occurred. Due to this, down line operations were halted and several trains were diverted.
Railway Track Collapses in Uttar Pradesh! 12 Trains Including Rajdhani Stuck, Passengers in Distress
The construction work on the Mirzapur-Jhingura section was going on. A sudden landslide occurred at around 6:20 pm on Tuesday, disrupting rail services.
Submerged soil on third line under construction, down operation prevented, 12 trains parked in outer
Mirzapur News: A new bridge is being built near Aamghat on the Mirzapur-PDDU railway line. During the construction work of the third railway line between Jhingura railway section, today at around 18:20, Mirzapur Hindi News
A mudslide during railway line construction in Mirzapur caused an electric pole to collapse on the down line of the Delhi-Howrah route. Train operations on the down line were halted following the incident on Tuesday evening.
Mirzapur Rail Construction Accident: A major accident was averted when soil caved in during the construction of the third railway line in Mirzapur. Several trains were diverted and cancelled, causing inconvenience to passengers. Learn the full story.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium











