Suriya Confirms that the Restoration of the R.1 Drainage Canal, Which Was Damaged by the Major Floods, Will Be Completed in Time for the Southern Flood Season.
2 Articles
2 Articles
"Suriya" reiterated that the restoration of the R.1 drainage canal, damaged by the Hat Yai floods, will be completed in time for the southern flood season. He emphasized accelerating canal dredging and improving the system's capacity. Responding to the Prime Minister's remark, "If it can't be solved, jump into the water," he implied that since they don't know how to swim, the solution must be found.
“Suriya” joins “Anutin” in Hat Yai to monitor water management, instructing the Royal Irrigation Department to expedite repairs to Canal R.1, dredge important canals, inspect the readiness of sluice gates, prepare machinery and personnel, and strictly implement the 9 measures to cope with the rainy season developed by the National Water Resources Management Committee (NWRC), along with developing a flood forecasting system… Read original news: ‘…
Coverage Details
Bias Distribution
- 100% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium

