Nordex to Supply Eight N163/6.X Wind Turbines for UMaAG’s Drochtersen Repowering Project
3 Articles
3 Articles
France – 06/06/2025 – energysdelamer.eu. Last Monday morning, the second section of the Vestas wind turbine was mounted, followed in the afternoon by the positioning of the nacelle. This morning, the first blade of float No. 1 of EFGL, designed by Principle Power, is being installed. Last summer, the blades of the EFGL pilot wind farm (as well as those of Eolmed) arrived at the port of Port-la-Neuve. At the end of August, the FNW Arctic ship, sp…
Nordex to Supply Eight N163/6.X Wind Turbines for UMaAG’s Drochtersen Repowering Project
Nordex to Supply Eight N163/6.X Wind Turbines for UMaAG’s Drochtersen Repowering Project (IN BRIEF) The Nordex Group has received a significant order from Umwelt Management AG (UMaAG) for the Drochtersen repowering project in Lower Saxony, Germany. The agreement includes the supply and installation of eight N163/6.X wind turbines and a 20-year service contract. Installation is planned for 2026, with full commissioning scheduled for 2027. Both UM…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
