Upgrades to Ease Congestion on Hunter Freight Route - Fully Loaded
3 Articles
3 Articles
New upgrades to Hunter freight route to bring faster journeys - PowerTorque
Image: Transport for NSWHunter transport operators are set to benefit from a $2.2 billion investment in the M1 to Raymond Terrace extension and the Hexham Straight Widening. In a joint federal and New South Wales government investment, the governments say it will reduce congestion and improve safety for all road users. SUBSCRIBE to the PowerTorque newsletter The federal […] New upgrades to Hunter freight route to bring faster journeys appeared f…
New lanes ease congestion for Hunter traffic corridor - Infrastructure Magazine
Image: Thomas/stock.adobe.com The first widened section of the Hexham Straight is now open to traffic, with three lanes in each direction reducing congestion on the critical Hunter corridor. The Federal and NSW Governments are collectively investing $2.2 billion in the M1 to Raymond Terrace extension and the Hexham Straight Widening to reduce congestion and improve safety for all road users. The Federal Government is contributing over $1.79 …
Upgrades to ease congestion on Hunter freight route - Fully Loaded
Image: Transport for NSWHunter freight operators are set to benefit from a $2.2 billion investment in the M1 to Raymond Terrace extension and the Hexham Straight Widening. In a joint federal and New South Wales government investment, the governments say it will reduce congestion and improve safety for all road users. The federal government is contributing over $1.79 billion towards the project, with the NSW government contributing $448 million. …
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium