Skip to main content
See every side of every news story
Published • loading... • Updated

Artemis III SLS Core Stage Joins Boosters at Kennedy

Summary by NASA (Source)
The SLS (Space Launch System) core stage is lifted from the transfer aisle of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Thursday, Oct. 22, 2026.NASA/Sean Cannon The SLS (Space Launch System) core stage is lifted from the transfer aisle of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Thursday, Oct. 22, 2026. NASA/Sean Cannon Th…

5 Articles

On October 28, 2026, NASA experts officially announced the successful integration of the central unit of the SLS launcher for the Artemis III expedition with a pair of powerful solid-fuel boosters. The work was carried out at the Kennedy Space Center, inside the famous Tseh vertical assembly (VAB). The configuration, known as the Short Stack, is now fully ready for the next series of tests.

Read Full Article

NASA integrates the central stage of Artemis III SLS, 64.6 meters, together with the two solid thrusters in the VAB of the Kennedy Space Center. La entrada Artemis III SLS: NASA connects the 212-foot central stage to the thrusters in the VAB aparece primero en Merca2.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

friendsofnasa.org broke the news on Tuesday, October 27, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal