The Charleroi-Brussels South airport will close completely for eleven weeks in the second half of 2028 to allow for the in-depth renovation of its single runway, with a total interruption of take-offs and landings.This temporary closure will require airlines to redeploy their flights to other Belgian platforms, notably Liège, or to suspend certain lines during the construction period.A historic closure to renovate the runwayThe operator Brussels…