Published • loading... • Updated
Litchfield launches phase three drilling at NT copper-zinc system
The seven-hole program will test VT1, VT2 and the Main Zone as Litchfield seeks to define the scale and continuity of the mineral system.
Summary by Sydney Morning Herald
3 Articles
3 Articles
Reposted by
The Age
Litchfield launches phase three drilling at NT copper-zinc system
Litchfield Minerals has begun phase three reverse circulation drilling at its Oonagalabi project in the NT to test the priority VT1 and VT2 geophysical targets and the Main Zone.
·Sydney, Australia
Read Full ArticleLitchfield steps up search for larger copper-zinc system at Oonagalabi
Litchfield launches RC drilling at Oonagalabi copper-zinc project in the NT Seeks to grow scale of mineralised system following strong 2025 copper-zinc hits Momentum builds with drilling, geophysical results and BHP Xplor backing Special Report: Litchfield Minerals has fired up the drill rig for a seven-hole RC program targeting recently defined targets at its Oonagalabi copper, zinc and precious metals project in the Northern Territory. The …
Coverage Details
Total News Sources3
Leaning Left2Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium

