Lake Victoria Gold Unveils Encouraging HQ Diamond Drilling Results at Imwelo Project
4 Articles
4 Articles
Lake Victoria Gold unveils encouraging HQ diamond drilling results at Imwelo project
Lake Victoria Gold Ltd. is excited to announce impressive assay results from recent HQ diamond drilling at its fully permitted Imwelo Gold Project in Tanzania. Highlights include 28.71 g/t gold over 2.75 metres starting at 21 metres depth in hole IMWDR029 and 12.20 g/t gold over 4.5 metres from 32 metres in hole IMWDR028, demonstrating …
Lake Victoria Gold Intersects 28.71 g/t Au over 2.75 m and 12.20 g/t Au over 4.50 m in Shallow Area C Drilling at Imwelo
Targeted whole-core metallurgical program on weathered ore advances clay-handling and final process-design decisions for the planned initial mining area
Lake Victoria Gold Intersects 28.71 g/t Au over 2.75 m and 12.20 g/t Au over 4.50 m in Shallow Area C Drilling at Imwelo - Lake Victoria Gold
Vancouver, British Columbia - August 27, 2026 - Lake Victoria Gold is pleased to report high-grade, near-surface assay results from recent HQ diamond drilling at its fully permitted Imwelo Gold Project... The post Lake Victoria Gold Intersects 28.71 g/t Au over 2.75 m and 12.20 g/t Au over 4.50 m in Shallow Area C Drilling at Imwelo first appeared on Lake Victoria Gold.
Coverage Details
Bias Distribution
- 100% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium







