Skip to main content

We've updated our Privacy Policy. Questions? Email us any time at privacy@ground.news

Published loading...Updated

Lake Victoria’s Tembo Holds 600K Oz. Gold Near Barrick

The maiden estimate includes 480,100 inferred ounces and 99,700 indicated ounces, with Ngula 1 set for close-spaced drilling and mine planning.

An initial resource for Lake Victoria Gold’s (TSXV: LVG) Tembo project in Tanzania shows the deposit contains almost 600,000 oz. gold next to Barrick Mining’s (TSX: ABX; NYSE: B) Bulyanhulu... The post Lake Victoria’s Tembo holds 600K oz. gold near Barrick appeared first on The Northern Miner.

10 Articles

The Toronto StarThe Toronto Star
+4 Reposted by 4 other sources
Lean Left

Approximately 500,000 Ounces Was Just Put On the Map Next Door to Bulyanhulu

A maiden NI 43-101 Mineral Resource Estimate of 480,100 Inferred and 99,700 Indicated ounces transforms the Tembo Gold Project from a collection of high-grade drill intercepts into a defined resource on granted Mining Licences, with a higher-grade core, a focused…

·Toronto, Canada
Read Full Article

Lake Victoria Gold Ltd. (TSXV:LVG) - Maiden Tembo MRE Sets the Stage for Near-Term Cash Flow - Research Portal

Lake Victoria Gold (LVG) released a maiden MRE for the Tembo gold project in NW Tanzania. The MRE stands at 580k oz of contained gold (16.0Mt of ore at 1.13 g/t Au). While this is a small and low-grade resource by Tanzanian standards, where orogenic peers typically run at 2.5-3 g/t Au, Tembo now has its first formal resource crystalizing the asset and putting ounces on the board. In our view, the two things that keep Tembo interesting are: 1) near-term production potential via a toll-milling agreement with Nyati Resources (Private), for which an LOI has been signed, and 2) exploration upside at the Ngula 1 target. Of all the targets at Tembo, Ngula 1 could be a analog of Barrick’s (TSX:ABX, Not Rated) 20M oz Bulyanhulu mine next door, where grades could improve down-dip if the system behaves like its neighbour. However, this is still hypothesis and needs to be tested further via the drill bit. A Nyati toll-milling option, if converted to a binding deal, could help fund exploration at Tembo to chase that blue-sky potential at depth. Although today’s announcement is a step in the right direction for Tembo and de-risks the company’s secondary asset, our attention remains on its flagship Imwelo project. Site development, earthworks, the camp and appointment of an EPCM contractor, are all advancing, but we note the US$25M Monetary Metals (Private) gold loan announced in April intended to cover the US$15M build, has not yet closed. It is grinding through the Bank of Tanzania's regulatory process and closing of this loan remains the key catalyst to watch.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources are Center
50% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Kingston Whig-Standard broke the news in Kingston, Canada on Tuesday, August 11, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal