Published 19 hours ago • loading... • Updated 19 hours ago
Interstate 80 Construction Update for Sierra Corridor Through Aug. 8
Caltrans says motorists could face up to two hours of cumulative delays as lane, ramp and one-way traffic controls continue on multiple projects.
Summary
PLACER/NEVADA COUNTIES – Caltrans is reminding motorists of various lane and ramp closures in multiple locations along Interstate 80 (I-80) as several projects continue in Placer and Nevada counties. Motorists will experience delays with each project. If traveling across the entire corridor, the cumulative delay may reach up to two hours depending on traffic volumes. […] The post Interstate 80 Construction Update for Sierra Corridor through Aug…