Skip to main content
See every side of every news story
Published loading...Updated

Heat Causes DuSable Lake Shore Drive Bridge over Chicago River to Stick in up Position, Snarling Traffic

Crews are working to cool the bridge and reopen DuSable Lake Shore Drive after a scheduled lift left it stuck open, snarling traffic.

Summary by CBS News
A major traffic jam is building up on DuSable Lake Shore Drive as the bridge over the Chicago River is stuck in the up position.

5 Articles

Parts of Lake Shore Drive experience vehicle retardation this Wednesday due to a problem on the bridge in the Grand area of Chicago.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 75% of the sources are Center
75% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

NBC Chicago broke the news in Chicago, United States on Wednesday, September 2, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal