Romania Has Received Three More Alstom Electric Trains. Which Routes Will Circulate the New Trains
5 Articles
5 Articles
The Railway Reform Authority (RFA) has announced that three more Alstom Coradia Stream electric trains have reached the reception stage, two of which are ready to enter the commercial service ...
The railway transport in Romania is preparing to receive new modern electric trains, and among the routes on which they will circulate is also the connection between Cluj-Napoca and Iasi. Two Alstom Coradia Stream branches have been received for the transport of passengers and delivered to CFR Travelers, while a third unit has passed the [...] Article The 1.7 billion lei electric trains will circulate and on the Cluj-Iași route appears first in …
New trains on the route Cluj-Napoca – Iași: Two more Alstom Coradia Stream trains have been received and delivered CFR TravelersTwo new electric trains, built by Alstom, can now travel with passengers, and one of their routes is Cluj-Napoca – Iași. The Authority for Railway Reform (ARF)...
The railway transport in Romania benefits from new investments in the modernization of the railway fleet. The Railway Reform Authority (ARF) announced the reception of three further interregional power lines Alstom Coradia Stream. On Tuesday, November 24, 2026, two of the new trains, identified with the TS27 and TS28, were received with a view to the introduction into circulation of passengers and delivered to the national operator CFR Travelers…
The Railway Reform Authority (RFA) informs that on Tuesday, 24 November 2026, the ARF, EGIS and ALSTOM representatives carried out the reception for commercial service with passengers of the RE-IR Coradia Stream electrical branches, units TS27 and TS28. At the same time, in the same action, the preliminary reception of the RE-IR TS29 electrical unit was carried out and the Factory Acceptance Test (FAT) for the TS29 electrical branch was complete…
Coverage Details
Bias Distribution
- 100% of the sources lean Left
Factuality
To view factuality data please Upgrade to Premium



