World-First: 4,370-Ton CO2 Storage Platform Installed Off UK Coast
The platform will route captured carbon from North West England and North Wales through repurposed pipelines for permanent storage, Eni said.
8 Articles
8 Articles
World's first purpose-built offshore carbon capture platform installed in Liverpool Bay
World’s first purpose-built offshore carbon capture and storage platform installed in Liverpool Bay, advancing the HyNet project and industrial decarbonisation.
Eni CCUS Holding (a joint venture of Eni and Global Infrastructure Partners in BlackRock) has completed the installation of the Douglas CCS carbon storage and processing platform in the Gulf of Liverpool, as reported by Douglas CCS, the world's first dedicated marine platform designed specifically for carbon capture and storage systems.
The new infrastructure will be the offshore hub of the Liverpool Bay Ccs project and will allow the transport and permanent storage of CO2 captured by the North-West industries of England and North Wales The article Industrial Decarbonization, Eni realizes the world's first offshore platform for CO2 capture and storage comes from Italian Industry.
Douglas CCS platform installed for Liverpool Bay carbon storage network
The Douglas CCS platform will serve as the offshore hub of the HyNet carbon transportation and storage network, distributing captured industrial CO₂ to depleted gas reservoirs beneath Liverpool Bay for permanent sequestration.
Coverage Details
Bias Distribution
- 75% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium








