Cuttack Railway Station Redevelopment Work: Temporary Diversion of Trains
4 Articles
4 Articles
3 long-distance trains to be diverted for redevelopment work at Cuttack Railway Station
Bhubaneswar: In view of the ongoing redevelopment work at Cuttack Railway Station under Khurda Road Division of the East Coast Railway (ECoR), three long-distance trains will run via diverted route for 40 days from August 11 to September 21. The Indian Railways are now undertaking construction of air concourse grid, refurbishment of platform surface with granite flooring and precast coping block, replacement of Platform shelter & roofing she…
Cuttack Railway Station redevelopment work: Temporary diversion of trains
Bhubaneswar, Aug 09: In view of ongoing construction of air concourse grid, refurbishment of platform surface with granite flooring and precast coping block, replacement of platform shelter & roofing sheets, pile foundation and steel column for air concourse and other safety related modernization works at Cuttack Railway Station under Khurda Road Division of East Coast Railway, three long distance trains will run via diverted route for 40 days f…
3 Long-Distance Trains To Be Diverted For Redevelopment Work At Cuttack Station; Here Are Details
Bhubaneswar: Three long-distance trains will be diverted for a month and a half, necessitated by ongoing redevelopment work of Cuttack railway station. For a period of 40 days – from August 11 to September 21 – the three trains will run via Barang-Naraj Marthapur-Kapilas Road, instead of the scheduled route via Barang-Cuttack-Kapilas Road. The three trains — 12515 Coimbatore-Silchar Weekly Super-Fast Express, 22643 Ernakulam-Patna bi-weekly Expr…
Cuttack Railway Station redevelopment work: Temporary diversion of trains - Update Odisha-Latest Odisha News I Breaking News
• Temporary Diversion of three long distance trains via Naraj Marthapur. • Construction of Air-Concourse grid, pile cap laying & other works at Cuttack Railway Station. Bhubaneswar: In view of ongoing construction of Air Concourse grid, Refurbishment of Platform surface with granite flooring and precast coping block, Replacement of Platform shelter & roofing sheets, Pile foundation and Steel column for Air Concourse and other safety related mode…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium