Comptroller Detects that the Modular Hospital of the Barros Luco Has Been Stored in Warehouse Since 2021
4 Articles
4 Articles
The health infrastructure, which was purchased during the emergency by Covid-19 and subsequently transferred to the Southern Metropolitan Health Service (SSMS), is completely disarmed in a warehouse in the municipality of San Miguel.
The structure—acquired in the context of the emergency by the COVID-19—includes all the equipment needed for its operation, such as stretchers, clinical beds and medical instruments, and had an initial cost of almost $3 billion.
The Comptroller General of the Republic (CGR) reported this Thursday that it found that the Modular Hospital of Campaign No.2 Barros Luco Trudeau has been kept in a warehouse since October 2021, without so far determining its use, reuse, reassignment or transfer, reports La Tercera. The organization, through the Final Report of...
The structure acquired in the context of the emergency by the Covid-19 includes all the necessary equipment for its operation, such as stretchers, clinical catres and medical instruments, and had an initial cost of almost $3 billion.
Coverage Details
Bias Distribution
- 100% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium



