Published • loading... • Updated
CNOOC Limited Announces Buzios6 Project Commences Production
Buzios6 boosts Buzios oilfield capacity to 1.15 million barrels per day, deploying emission reduction and energy-saving technologies, CNOOC Limited announced.
- CNOOC Limited announced the Buzios6 project has commenced production, the company said, raising installed production capacity of the Buzios oilfield to 1.15 million barrels per day.
- Built with an FPSO and subsea system, the Buzios6 development plan includes 13 wells, with six oil producers and seven injectors, as announced by the company.
- The FPSO serving Buzios6 has specific oil, gas and storage capacities, designed for 180,000 barrels per day oil, 7.2 million cubic meters per day gas, and 2 million barrels storage, and is equipped with closed flare and heat recovery devices to reduce emissions and energy use.
- CNOOC Limited announced the Buzios6 project has commenced production, noting risks and warning actual results may differ materially, with CNOOC Petroleum Brasil Ltda. holding a 7.34% interest, and Petrobras being the operator.
- The Buzios field is the world's largest deep‑water pre‑salt oilfield, and Buzios6 is the seventh project commissioned in the field in the Santos Basin, offshore southeast Brazil.
Insights by Ground AI
58 Articles
58 Articles
+57 Reposted by 57 other sources
CNOOC Limited Announces Buzios6 Project Commences Production
HONG KONG, Jan. 2, 2026 /PRNewswire/ -- CNOOC Limited (the "Company", SEHK: 00883 (HKD Counter) and 80883 (RMB Counter), SSE: 600938) announces that Buzios6 Project has commenced production safely.
Coverage Details
Total News Sources58
Leaning Left7Leaning Right9Center20Last UpdatedBias Distribution56% Center
Bias Distribution
- 56% of the sources are Center
56% Center
L 19%
C 56%
R 25%
Factuality
To view factuality data please Upgrade to Premium




















