Black & Veatch was appointed by PT PP to work on the design of the Batam Bintan 1 PLTGU with a capacity of 120 MW to strengthen Batam's electricity system.
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Black & Veatch was appointed by PT PP to work on the design of the Batam Bintan 1 PLTGU with a capacity of 120 MW to strengthen Batam's electricity system.