Baker Hughes sets up new unit in Telangana's Siddipet, 230 jobs on cards
5 Articles
5 Articles
Baker Hughes sets up new unit in Telangana's Siddipet, 230 jobs on cards
Hyderabad: American energy technology major Baker Hughes launched a lean manufacturing facility at the Azad-Centre of Excellence & Innovation in TGIIC Industrial Park at Tuniki Bollaram village in Siddipet district. This new facility was officially launched on Thursday, April 23, by the IT and Industries Minister of Telangana, D Sridhar Babu. With a built-up area of 7,600 square meters, the plant will produce precision parts for the IET segment …
Azad Engineering shines on inaugurating lean manufacturing facility in Hyderabad
Mumbai, April 24 (Udaipur Kiran): Azad Engineering is currently trading at Rs. 2195.00, up by 89.30 points or 4.24% from its previous closing of Rs. 2108.55 on the BSE. The scrip opened at Rs. 2134.95 and has touched a high and low of Rs. 2202.75 and Rs. 2117.25 respectively. So far 33431 shares were traded on the counter. The BSE group ‘A’ stock of face value Rs. 2 has touched a 52 week high of Rs. 2,202.75 on 24-Apr-2026 and a 52 week low of R…
Sridhar Babu opens new energy technology unit at TGIIC industrial park
Sridhar Babu opens new energy technology unit at TGIIC industrial park Hyderabad, April 23 (RAHNUMA): Minister for IT and Industries Duddilla Sridhar Babu formally inaugurated ‘The Exclusive Lean Manufacturing Facility for Baker Hughes’ at the Azad–Centre of Excellence & Innovation Centre, located within the TGIIC Industrial Park in Tuniki Bollaram village of Mulugu mandal in Siddipet district on Thursday. The facility has been established over …
AZAD Engineering Inaugurates Dedicated Lean Manufacturing Facility for Baker Hughes
Azad Engineering inaugurated a 7,600 sq. m. next-gen lean manufacturing facility in Hyderabad to support Baker Hughes, strengthening its global precision engineering capabilities and standards. Hyderabad (Telangana) [India], April 23: Azad Engineering, at the forefront of precision engineering, marked another significant milestone with the inauguration of a 7,600 sq. m. next-generation lean manufacturing facility at […] The post AZAD Engineering…
Coverage Details
Bias Distribution
- 100% of the sources lean Left
Factuality
To view factuality data please Upgrade to Premium
