Skip to main content
See every side of every news story
Published loading...Updated

An Exceptional Project Is Nearing Completion in Seinäjoki: 800 Truckloads of Toxic Soil Were Excavated From the Contaminated Riverbed

Summary by Yle
The Seinäjoki Pajuluoma has been completely rebuilt over a kilometre, and 800 truckloads of toxic soil have been removed. The work had to be done carefully.

1 Articles

Center

The Seinäjoki Pajuluoma has been completely rebuilt over a kilometre, and 800 truckloads of toxic soil have been removed. The work had to be done carefully.

·Helsinki, Finland
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

yle broke the news in Helsinki, Finland on Monday, September 7, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal