KM263.6 Southbound Towards Menora Tunnel Now Safe for Motorists After Rapid Slope‑erosion Mitigation, Says Perak Exco
3 Articles
3 Articles
KM263.6 southbound towards Menora Tunnel now safe for motorists after rapid slope‑erosion mitigation, says Perak exco
IPOH, Sept 14 — The state government has assured that the North-South Expressway (PLUS) route near KM263.6, southbound towards the Meru-Ipoh Utara (Menora) Tunnel, is now safe...
IPOH: Soil erosion near the Meru Tunnel at Kilometer 263.6, Southbound North-South Expressway here last Friday was caused by above-normal rainfall which caused soil movement. Perak Infrastructure, Energy, Water and Public Transport Committee Chairman, Datuk Seri Mohammad Nizar Jamaluddin said the movement of soil, rocks and trees in turn caused the erosion. ...
IPOH – The soil erosion that occurred near the Meru Tunnel at Kilometer 263.6, Southbound North-South Expressway here last Friday was caused by above-normal rainfall causing soil movement, which caused erosion. Perak Infrastructure, Energy, Water and Public Transport Committee Chairman, Datuk Seri Mohammad Nizar Jamaluddin said the soil erosion was caused by the rainfall ...
Coverage Details
Bias Distribution
- 100% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium






