Published • loading... • Updated
Abertillery Wind Farm refused
Summary by National Wind Watch
1 Articles
1 Articles
Abertillery Wind Farm refused
Applicant: RWE Renewables UK Ltd Site Address: Land between Abertillery and Abersychan Description: The construction and operation of up to six wind turbines with a maximum blade tip height of up to 200m and associated infrastructure. References: DNS/3278009, S16 & S38 Common Land Secondary Consent Applications Decision Date: 06/03/2026 Decisions: The applications are refused. Having regard to the written evidence, the main issues in the determi…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
