Skip to main content
See every side of every news story
Published loading...Updated

2 years of construction wraps up with new sidewalks through Old Town Silverdale

Summary by Ground News
$26 million project installed new water lines, a sewer system and stormwater pipes. Back roads and new sidewalks built along Bayshore Drive and Washington Avenue NW. Kitsap County Commissioner Ed Wolfe hopes it will mark the dawn of a new era for Old Town Silverdale.

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Kitsap Sun broke the news in on Monday, September 26, 2022.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal