Recently inaugurated after two years of construction, an intercommunal swimming pool presents an incredible size error in its basin, which does not measure the 25 meters expected by the Federation. Amateurs...
The intercommunal pool of Belley, in the Ain, has reopened after two years of work of a cost of 13 million euros with a basin too short of three centimetres. Measuring 24,97 meters instead of the 25 centimeters...