Metropolitan Train Cluj: The Winner of the Contract Has Been Appointed for the Modernization of the Railway on Lot 2
5 Articles
5 Articles
Works on the future Metropolitan Train Cluj take an important step: CFR SA has established the builder for Lot 2 of the Apahida – Jucu – Bontida route. The investment in the modernization of this portion of railway infrastructure amounts to more than 93,6 million lei (without VAT).
CFR SA has designated the company Swietelsky Construct SRL winner of the contract for the modernization of the railway infrastructure on the Apahida – Jucu – Bontida route, part of the future Metropolitan Train Cluj. The contract has a value of 93.68 million lei, without VAT, and aims at works for a total length of 25.4 kilometers of railway. The contract [...]
A new step in the realization of the project of the Metropolitan Train Cluj was made after the CFR SA has designated the winner of the contract for the modernization of the railway infrastructure of Lot 2 of the route Apahida – Jucu – Bontida. The value of the contract exceeds 93,6 million lei, without VAT. The winning offer was submitted by the company Swietelsky Construct SRL, having [...] Article The Metropolitan Train Cluj takes a new step f…
CFR SA has designated the winning offer for the works of modernization of the railways on the route Apahida – Jucu – Bontida, part of the project of the Metropolitan Train Cluj. Read the Metropolitan Train Cluj: Contract of more than 93 million lei for modernization of the Apahida – Jucu – Bontida railways in Cluj24.ro.
The company CFR SA has designated the winner of the contract for Lot 2 of the works of modernization of the railway infrastructure of the Apahida – Jucu – Bontida route, part of the future Metropolitan Train Cluj. The contract has a value of more than 93,6 million lei, without VAT.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium







