The capital and its metropolitan area try to return to normal between cordoned streets, a multitude of workers and neighbors who continue to scare the body
Of the total, 459 have been classified in green, 105 in yellow and none need be demolished.The Seismic Risk Emergency Plan remains active in emergency phase, operational situation 1
The technical architects have launched the revisions of the infrastructure of the center that have suffered the most damage caused by the last tremors Granada reinforces the inspections to buildings after the earthquake: 800 requests and 154